Fabric / Fit Out

Laboratory Fit Out

QBS completed a project at a university research facility which included the formation of a dedicated research laboratory. The works were required to provide a specific work space for a particular research project which involved matching the high specification to suit the conditions required.

The client had identified an existing vacant room within their facility for the location of the new laboratory which had challenges in terms of designing and installing the HVAC services. The performance specification for the laboratory was in accordance with a Government Code of Practice which specified temperature, humidity and air volume changes with close control and monitoring for each separate zone. The CoP also specified circadian lighting which required a specialised lighting control system. QBS provided the client with a single source, Turnkey, Design and Build solution including project management. QBS engaged with all stake holders and specialist equipment suppliers at the concept phase of the project developing the performance specification and coordinating the services prior to implementation.

QBS Project Ref: CT01993
Lee Ringer – Contracts Manager

Related Projects