Mechanical

Trading Floor Airconditioning Installation

QBS received an enquiry to investigate the high temperatures on the trading floor. A validation of the existing services and design was completed. QBS designed and built an additional HVAC system to maintain the design space temperature.

The Trading Floor critical environment utilised the landlord base build HVAC system for heating and cooling. QBS validated the base build performance and the required cooling capacity and designed a new additional VRV system to achieve design space temperature.

The new VRV systems were installed out of hours without disruption to the client BAU.

The works included:

  • Validation and condition survey of existing services
  • Design of new additional VRV systems
  • Integration and control of new VRV with existing services
  • On going seasonal commissioning and technical support
  • Space temperature sensors provided data records of space temperatures and close control
CT02735
Quentin Hemens – Director

Related Projects